West Horndon Platform Reconstruction
Following inspection work that deemed part of the length of platform 1 beyond economic repair, an effective design was successfully developed within stringent timescales, and largely constructed during a 52 hour Christmas blockade. The new platform comprises CFA piles, reinforced concrete pile caps and suspended precast concrete planks. Particular attention was paid to longevity aspects, […]